← 稲荷 Inari Protocol · Cases
稲荷 Inari Protocol — National Abundance Program · Capture pillar · node-siting map

Capture Pillar · Node-Siting Model · Phase 3

Site the chains — where Capture’s five bets land

Five capture chains, one siting method. A six-layer regional score ranks New Zealand’s sixteen regions against each chain; convergence is where the layers stack. Reproduces the Phase 2/3 exhibit — forestry and hydrogen to the central North Island, fertiliser to Taranaki, steel to Waikato, dairy heat to the southern belt.

01 · Locate the convergence

Where the five chains anchor

Gold-tinted regions are anchored by at least one chain · numbered pins cross-reference the list at right · hover any region or pin for detail.

13245geometry: Stats NZ RC 2025 (generalised) · CC-BY 4.0

Anchors on the map

  1. 1Engineered timber Best-fitBay of Plenty
  2. 3Green ammonia / urea Best-fitTaranaki
  3. 2Green H₂ Staged-conditionalBay of Plenty
  4. 4Green steel Staged-conditionalWaikato
  5. 5Dairy process heat Established sectorSouthland

Verdict key

Best-fit — modelled, ranks first on the six-layer score Staged-conditional — fits on siting, blocked on scale or process readiness Established sector — existing capture activity, siting reconfirmed Niche-only — not modelled at national scale

Green methanol carries no convergence result: greening the country’s one large-scale gas-fed methanol plant has no concentrated domestic CO2 source at hand, so the model flags it niche-only rather than siting it — see row 6 in §03.

02 · Score the fit — six layers, ranked per chain

The node-siting method

Read directly off the seed data — not a separately computed model run.

score(region, chain) over 6 layers {surplus_energy, feedstock_cluster, port_cold_chain, water_headroom, workforce_housing, grid_hosting} — rank per chain

Surplus energy

Usable generation left once regional load is met — near-baseload capacity factor counts for more than raw TWh.

family: energy resource + demand

Feedstock cluster

How concentrated the physical input already is — standing forest, ore body, an existing plant, dairy-herd density.

family: food & fibre / production nodes

Port & cold-chain

Export and import throughput, plus reefer capacity, to move what the chain makes.

family: ports & logistics

Water headroom

Freshwater allocation status — an over-allocation flag or a no-new-take river costs a region this layer.

family: freshwater

Workforce & housing

Skills, labour and housing capacity to support a build.

Declared gap — no regional data sourced yet

Grid hosting

Network headroom at the connection point.

pinch points known qualitatively; GXP-level table not yet published

ChainSurplus energyFeedstock clusterPort & cold-chainWater headroomWorkforce & housingGrid hosting
Engineered timbergap
Green ammonia / ureagap
Green H₂gap
Green steelgap
Dairy process heatgap
Green methanolgap
primary — the layer that decides the sitesecondary — supports the fit— not decisive for this chain

Two layers carry a declared gap in the current seed rather than a score: workforce_housing (no regional skills/labour data sourced yet) and the machine-readable grid_hosting table (pinch points — Hamilton N-1, Upper-NI voltage, North Taranaki spine, Auckland Flatbush-Hunua, Northland Huapai — are known qualitatively; GXP-level detail is a later-phase close). The primary/secondary marks above are read qualitatively off the model’s own notes, not a computed numeric score.

03 · Read the fit, chain by chain

Chain by chain

Class/region level only — no named facilities, no counterparties, no pricing.

ChainBest-fit regionWhy (aligning layers)Verdict
Engineered timberBay of PlentyAnchors the central North Island's forestry-processing cluster and the country's dominant container/cold-chain gateway (~1.2M TEU, reefer-dominant) — and national supply is under-processed (only ~35–40% of the ~33.6M m³/yr harvest is processed onshore), so the torque is highest here. Energy-light (2–3 MWh/m³), so it doesn't compete for surplus power.Best-fit
Green ammonia / ureaTaranakiAn existing gas-era ammonia-urea plant and its industrial grid spine already sit in the region, so greening is a brownfield conversion, not a new build — the model's own read: “smallest lift, real import-substitution,” against an order-of-magnitude 350–470 kt/yr of import-substituted urea (6–7 MWh/t urea).Best-fit
Green H₂Bay of PlentyThe region's geothermal base runs near-baseload — a strong capacity-factor fit for electrolysis — and shares the timber chain's export gateway. Conditional: order-of-magnitude 2050 demand (0.64–1.38 Mt H₂/yr) implies 35–76 TWh of new generation, 80–170% of what the whole country generates today. The site fits; the supply doesn't exist yet.Staged-conditional
Green steelWaikatoNew Zealand holds its own ore in regional titanomagnetite ironsand deposits, with existing integrated steelmaking capacity already sited here; full conversion draws an order-of-magnitude ~2.6 TWh (~6% of national generation) — real but not overwhelming. Conditional: the ore is not standard DRI-grade — a bespoke, unproven-past-pilot process bet, not a siting problem.Staged-conditional
Dairy process heatSouthlandAnchors the South Island dairy belt — one of five processing regions alongside Waikato, Taranaki, Canterbury and West Coast — with regional dairy/meat export capacity, and unlike Canterbury and Otago (both flagged over-allocated) or Hawke's Bay's aquifer, carries no freshwater over-allocation flag in the current staged data. A decarbonisation-siting call on an existing build, not a greenfield one.Established sector
Green methanol— not sited —No concentrated domestic CO2 source exists to green the country's one large-scale gas-fed methanol plant (an order-of-magnitude ~26 TWh, ~60% of national generation, would be required). Flagged as a marine-fuel niche opportunity only — not a national-scale capture chain — so it carries no regional convergence result.Niche-only
Source: nz_atlas.seed.json — capture_chains_p3 (D-078 executed, ratified 2026-07-18): chains, node_siting method + convergence, regions[]. Region geometry: Stats NZ Regional Council 2025 (generalised), CC-BY 4.0, via nz_region_geometry.json (D-079).
Scenario, not forecast · order-of-magnitude · class/region level only · Wall (D-017) applies — no pricing, no counterparties, no named facilities.
© 2026 Black Japan Group · Inari Protocol · inari@blackjapan.group