Overview

The Surplus-to-Structure model library. 18 core models, 63 modules, 5 use-case clusters. Library views describe the content; Topology views describe relationships, dependencies and coverage.

18 Core Models
1 upstream gate (CM-0), 11 analytical (CM-1 to CM-11), 1 real options (CM-13), 1 defence procurement (CM-14), 1 platform (CM-12).
40 Configurable Modules
Parameterised instances of parent model logic. Shared schemas. New industry = new module, not new model.
5 Use-Case Clusters
Productive Surplus · Grid Arbitrage · Strategic Materials · Sovereign Necessities (incl. Defence) · Platform / Finance.
8 Value Conversions
Every model maps to one: fuel avoided, stored, inventory, structure, mobility, cash flow, resilience, platform.
6 Jurisdictions (1 + 5)
CM-0 is a template. Calibrated instances: NZ (built), AU NEM (todo), Niue (todo), Pacific generic (todo), next country (pattern-driven).
~67% Universal
12 of 18 cores are jurisdiction-independent. Build once, use everywhere. New country = re-instantiate the other 6.

Five Use-Case Clusters

Defence Procurement merged into Sovereign Necessities — defence-energy resilience is a specialised sovereign-supply-chain logic with the same driver (national security), customer (government), funding (procurement appropriation), and margin (cost-plus + reliability premium).

ClusterDriverExample chainsLead models
Productive Surplus"What to do with excess kWh?"Water, ice, thermal, DAC, fermentation, RAS, vertical farms, e-boilersCM-4 + CM-7
Grid Arbitrage"Time-localised price advantage"Milling, cement, electrowinning, ammonia, DACCM-3 + CM-2
Strategic Materials"Sovereign industrial capability"Magnets, battery materials, green steel, PtX, recyclingCM-2 + CM-8
Sovereign Necessities"Supply chain resilience + national security"Fertiliser, pharma, stockpile, data centre, defence installationsCM-2 + CM-10 + CM-13 + CM-14
Platform / Finance"Scale across deployments"Portfolio, learning curve, orchestration, ABMCM-6 + CM-11 + CM-12 + CM-13

Core Models 15

Click any card to expand modules and parameters.

Modules 40

Configurable instances of parent model logic.

Sovereign Necessities incl. Defence

Production chains where the driver is supply chain resilience and national security rather than arbitrage or export margin. Defence procurement is a specialised sub-cluster within this — same logic, bespoke contract authorities.

Active Pipeline / Reference Projects

ProjectStatusValueStructure
US Army Corps ERCIP $2B contractAwarded Apr 2026$2B / 14 FY26 projectsIDIQ + design-build
RAAF Base Tindal Renewable Microgrid (EST10003)Procurement Apr 2026~2MW inv + 2.6-4.4 MW PV + 8-10 MWh BESSDSC + Document & Construct
RAAF Darwin + Robertson BarracksOperatingBehind-the-meter PV/storagePPA for Renewable Energy NT
HMAS Stirling (Garden Island)OperatingIntegrated microgrid + storageDefence-operated
Ellsworth AFB BESSOperatingCritical backup for mission opsWest River Electric coop
Fort Bragg, White Sands, Cape Cod SFSFY26 ERCIP queueEnergy system upgradesERCIP procurement
Overseas: Guam, Germany, JapanFY26 ERCIP queueAllied installation resilienceERCIP + host nation
Civilian SovereignDefence (sub-cluster)
DriverSupply chain resilience, crisis prep, national securityMission energy resilience, fuel convoy reduction, force readiness
CustomerHealth systems · Government · Farmers · Critical infrastructureDefence forces · Allied installations · Defence supply chain
FundingStrategic procurement · Concessional · Carbon credits · GrantsERCIP appropriation · MILCON · Defence capital · Host nation coop
AuthoritiesHealth/agriculture/critical-infra acts · Privacy/data laws10 USC 2911, MILCON, EUL (10 USC 2667), PPA (10 USC 2922a)
Contract structurePPA, take-or-pay, availability paymentEUL+PPA=EaaS, IDIQ, MILCON, ERCIP-style
ProcurementOpen RFP, sovereign procurement codesCleared contractors, classification overhead, security review
JustificationResilience value, cost of failure (lives/economy)Mission readiness, classified resilience
Margin profileCost-plus with reliability premiumCost-plus with reliability + cyber + supply chain integrity

Master Matrix

Two dimensions. Rows: 8 value-conversion types. Columns: 5 use-case clusters. Cells populated with modules and cores. Empty cells are intentional — incompatible or coverage gaps.

Universal core
Grid
Microgrid
Productive
Strategic
Sovereign (incl. defence)

Dependency DAG

Solid arrows: hard prereqs. Dashed arrows: informational feeds. Layered top-down by build order.

L0 Data foundation
L1 Upstream gate
L2 Universal analytical
L3 Domain-specific
L4 Integration & platform
Path A — Greenfield Microgrid
ETL → CM-0 → CM-1 → CM-2 → CM-4 → CM-5 → CM-6.
Path B — Grid Arbitrage Industrial
ETL → Delivered Price → CM-0 → CM-1 → CM-2 → CM-3 → CM-6.
Path C — Productive Surplus Chain
CM-4 → CM-7 → [PS module] → CM-8 → CM-6.
Path D — Sovereign Necessity
CM-0 → CM-1 → CM-2 → CM-10 → CM-6 → CM-13.
Path E — Defence Installation
CM-9 → CM-4 → CM-10 → CM-14 → CM-6.
Path F — Platform / Portfolio
All Path A-E → CM-12 → CM-11 / Portfolio.
FeedbackOutputFeeds back toReplacesWhy it matters
CM-2 → CM-0Stage-TEA wealth/TWhCM-0 production mix weightsOOM wealth-per-TWh guessesNZ tornado #1 sensitivity
CM-7 → CM-0Value-per-kWh from productive assetsCM-0 sectoral wealthFood processing $/MWh estimateCloses calibration loop
CM-6 → CM-0Project finance returns by sectorCM-0 production mix filterNaive electricity-intensity weightingViability filter
CM-11 → CM-1Long-run rent-erosion observationsCM-1 market defensibilityStatic defensibility assumptionTests competitive survival
CM-3 → CM-0Observed dispatch achieved CF + priceCM-0 T3 surplus consumptionTheoretical surplus availabilityReal arbitrage erodes surplus
CM-10 → CM-6Stress-test failure probabilitiesCM-6 reserve sizingIndustry-standard contingencyModelled risk replaces 10-15% rule of thumb

Reverse Index

Given a module or client use-case, which cores get invoked? Useful when scoping a specific chain.

Template × Jurisdiction

CM-0 is a template. NZ instance is calibrated and back-tested. UNIV = universal logic (no per-country instance needed). Only 6 of 18 cores need re-instantiation per jurisdiction.

UNIV
TMPL
TODO
PART
BUILT
NZ — Existing
CM-0 back-tested 2000-2024. Sectoral wealth/TWh decomposition partial. Effort to extend: M.
AU NEM Regional
Most complex re-build. National waterfall less informative than regional. Effort: L.
Niue
CM-0 less relevant — island scale means engineered surplus. CM-4/5/6/7 lead. Effort: S-M.
Pacific Generic Template
After Niue, ~20 island states with parameter swaps. Effort: M after first.
Next Country Pattern
Source ingestion + demand decomp + wealth benchmark + sovereign mapping. Effort: M.
Universal Model Maintenance
12 of 18 cores universal. ~67% of library is jurisdiction-free.

Glossary

TermDefinition
CM-nCore Model. 15 in v5.
Tier 3Productive surplus — energy remaining after Tier 0/1/2 (floor, comfort, resilience reserve) allocated in CM-0.
ClusterUse-case grouping by buyer/driver. 5 in v5.
ConversionWhat energy becomes. 8 types: fuel avoided, stored, inventory, structure, mobility, cash flow, resilience, platform.
UniversalModel whose logic is jurisdiction-independent. Build once, use everywhere.
JurisdictionalModel needing per-country calibration. 6 of 18 cores.
EaaSEnergy-as-a-Service. Defence contract structure combining EUL + PPA authorities.
ERCIPEnergy Resilience and Conservation Investment Program. US DoD funding for installation energy.
MLFMarginal Loss Factor. AEMO adjustment converting regional price to nodal effective price.
p_effEffective delivered electricity price. spot × MLF + network + retail + losses + congestion.
CFCapacity Factor. Actual run hours / 8760.
DSCRDebt Service Coverage Ratio. Project finance covenant.
RASRecirculating Aquaculture System. Land-based fish farming with controlled water reuse.
PtXPower-to-X. Surplus electricity → H₂ → ammonia / methanol / e-fuels.
DACDirect Air Capture. CO₂ removal from atmosphere. Flexible adsorbent systems.
ABMAgent-Based Model. CM-11. Long-run market emergence simulation.